What does a solar feasibility assessment include?
We assess energy consumption, roof conditions, shading, structural needs, and local grid requirements before designing your system.
Which engineering standards guide your solar installations?
Our systems can use BIS-certified modules, IP65-rated inverters, wind-load-tested racking, and compliant protection equipment.
Can tvashta design systems for industrial facilities?
Yes. We design systems for homes, businesses, factories, agricultural sites, and utility-scale applications.
Do you assist with DISCOM approvals and net-metering?
We support documentation and coordination for applicable DISCOM approvals, net-metering, and grid interconnection processes.
How long does a typical solar project take?
Project timelines depend on size, site readiness, approvals, and equipment availability; feasibility assessment provides a clearer schedule.